Electroniki

The construction works at “Electroniki” store at Peristeri included the painting of all surfaces, general maintenance works and rearrangement of specific areas. The normal function of the 3-level store has not been interrupted during working period that lasted 20 days. The execution of works was carefully designed and organized in cooperation with the store manager, due to the sensitivity and the large quantity of products.