CORE completed the new store in Sun Plaza Mall in 2 stages. The first stage was the temporary Pop-up store which opened in December 2017 and the construction time was 10 days. The permanent store opened in February 2018 with total construction time 20 days. The project’s architectural and electromechanical designs were carried out by MAC’s in house architects and local designers.
Previous
Mac Plaza Mall
Mac Plaza Mall
Next
Piraeus Port Plaza 1
Piraeus Port Plaza 1