Project Location:19 Iroon Polytechniou Str., Chalandri, Attica, Greece
Construction Period:March - July 2025
Designers:YAP Architects
Surface:2.225 m²
Scope of Works: office fit-out, architectural works, small building façade modification, landscape works, MEP works, IT room
Highlights: design respecting the building’s industrial character (exposed concrete and metal reinforcements from previous phase), connection of the two buildings via “hot desk” metal platform, open ceiling coordination, outdoor garden, canopies and metal pergola, early delivery of IT room

